PTL 11.0 Production


Goal:

• Schedule and produce job stone

Outline:

  9.0 Job Number Assignment
10.0 Production Preparation
PTL 11.0 Production
          11.1 Administrative Set Up - (Numbers room receives production package from drafting)
          11.2 New Molds Schedule - (Establish final tooling (new mold completion) schedule)
          11.3 Production Floor Schedule - (Establish production schedule based on tooling schedule and other factors)
          11.4 SMP Movement To Production - (Locate and move existing mold (Stock Mold Pull) to produce staging area)
          11.5 New Molds Fabrication/Delivery To Production - (Finish new molds and move to production staging area)
          11.6 Special Raw Materials Receipt Verification - (Confirm special raw materials received and available for production)
          11.7 Stone Production - (Produce stone parts as specified on shop ticket)
          11.8 Stone Curing Cleared - (Complete curing of stone and move stone to shipping)
          11.9 Set Mold Destroy Schedule - (Evaluate molds and set date for destruction is destruction is desired)
          11.10 Close Production - (All stones produced for this job are complete and no longer in production)